Commissioning
Services
What is commissioning?
Commissioning is the most crucial step in the installation as it involves a series of checks, tests and procedures to ensure our Water Booster, Sewerage & Stormwater pump stations designed for you will function efficiently & as designed. The Maxijet Service team will ensure the system is installed in accordance with our pre-commissioning checklist & our trained technicians will attend the site and assure you that another top-notch system has been installed as specified.
Pre-commissioning checklist
Pit Installation
- Pump and float cables pulled through conduit
- The pit is clean and clear of debris i.e mud, rocks, rubbish
- Pumps are lowered into the pit and plumbed in place
- Pumps are connected to discharge pipework
- Pump well filled up with clean water for testing on commissioning
Controller Installation
- The control panel is in a fixed position and is at a serviceable height (900mm from the ground)
- Conduits are mechanically protected between ground level and control panel
- Cables installed into the control panel – (float cables ready for termination, pump cables must be terminated before our visit by a qualified electrician)
Controller Wiring
- Float cables pulled through the base plate ready to be terminated.
- The pump cables have been terminated.